Location:
Shoreditch, London, E1 6JJ, UK
Working_time:
From September 2020 to January 2022
Project_info:
Unitized curtain wall from GF to roof with GRC in some areas. Stick curtain wall at ground floor and L13 terrace
My_tasks:
- Unitized curtain wall design for some specific areas.
- Stick design for GF and terrace
- Builders works drawings coordination.
- Non standard brackets design.
- Unitized element workshop drawings and managing a design team overseas.
- GRC manufacturing drawings and coordination with GRC supplier.
- Steel manufacturing drawings for roof terrace.